Skid units for ZVU Engineering a.s., Czech Republic
12. 8. 2020
We have successfully completed the SKID units installation for ZVU Engineering a.s.
Take a look at the pictures from the finished project for ZVU Engineering a.s., pre-assembly and installation of IN & OFF SKID piping and technological equipment for 30.000 Nm3 / h Hydrogen Plant.
This hydrogen unit has been built for a Russian customer. It consists of:
- 13 SKID units, incl. pipe-rack,
- 174 tons of piping,
- 16 tons of support,
- 13 pcs of technological equipment (total weight 246 tons).
The contract included painting, insulation and packaging. Total 46.000 man-hours.
Started August 26, 2019, finish July 2020