Skid units for ZVU Engineering a.s., Czech Republic

12. 8. 2020

We have successfully completed the SKID units installation for ZVU Engineering a.s.

Take a look at the pictures from the finished  project for ZVU Engineering a.s., pre-assembly and installation of IN & OFF SKID piping and technological equipment for 30.000 Nm3 / h Hydrogen Plant.

This hydrogen unit has been built for a Russian customer. It consists of:

  • 13 SKID units, incl. pipe-rack,
  • 174 tons of piping,
  • 16 tons of support,
  • 13 pcs of technological equipment (total weight 246 tons).

The contract included painting, insulation and packaging. Total 46.000 man-hours.

Started August 26, 2019, finish July 2020