Adiabatic Nitration of Benzene
Production Installation Steel structure
In 2020, we started to cooperate on the project Adiabatic Nitration of Benzene implemented in Ostrava. These included the supply, production and assembly of auxiliary steel structures, pre-production and installation of pipes of class 11 and 17.
Basic parameters of the project
Realization term: 08/2020 - 07/2021
Industry: Petrochemicals
Quality requirements: PED CAT II - 30%/CAT I - 10%
Used pipe materials: 1.0345 / 1.0255 / 1.4304 / 1.4404 / 1.4539 / 1.4541
Stage 3 of the project
In the second half of 2021, we successfully completed the 3rd phase of the project Subsequently, comprehensive tests took place.
Order parameters:
Pipe installation 95 000 kg
Production and assembly of POK 34 000 kg
NDT
Scaffolding
Storage
Mechanisation
PTD.
65,000 hours were done on the project.
Despite all the problems caused by covid-19 restrictions, we successfully managed the order thanks to the deployment of our installers and construction management. We thank all our employees, co-workers, suppliers and our customer for their trust.