In 2021, we have started pre-production of pipes for the French client ALLIA in our workshop.

It was a multi-million investment project focused on the production and installation of equipment for a biomass cogeneration plant.
Specifically, we produced 480 m of pipes DN 25 to DN 800 made of carbon and stainless steel according to the PED up to category III. In addition, piperacks weighing approximately 7 tons were made. Subsequently, at the end of 2021, the installation took place on site in France. 2022.

All production was carried out according to ASME standards under strict control. Work were completed in February