Replacement of an autoclave for AGC automotive glass Chuděřice.

Installation Technological equipment

Replacement of an autoclave for AGC automotive glass Chuděřice.

Works included disassembly of an old autoclave accessories (year 1992, weight 35 tons).

Another of our successfully finished projects: replacement of an autoclave for AGC automotive glass Chuděřice.

Works included:

  • disassembly of an old autoclave accessories (year 1992, weight 35 tons),
  • autoclave own disassembly, lifting from intercepting bath,
  • transport on transport platforms to place 80m far, loading and its disposal.

 Installation of a new autoclave (weight 45 tons) followed:

  • transport to intercepting bath.
  • It was necessary to reinforce local steel structures and to cut 3 supporting columns of pipe-rack.
  • Following works included switching station installation, production and installation of an air piping system, cooling water piping system and exhaust piping. 

Total time:  3 weeks.

Are you looking for installation company?