Service platform production

Production

Complete production of steel platform

For our customer we produced a service platform made of carbon steel with an aluminum floor.  The welding method was CO2 – 135.  Thanks to our new plasma cutting center, we were able to meet the short deadline for pre-production. The construction was screwed and the profiles contained a large number of holes. And that was done thanks to our plasma! Because of that we saved up to 100 standard hours, which would otherwise have to be worked by a worker with a drill press.