ZVU Engineering a.s., Hradec Králové, Czech Republic

Production Installation Piping systems Investments units Technological equipment

Hydrogen Skid Units

Our first assembly of skid units for ZVU Engineering a.s. It was the production of a hydrogen station.

IN &OFF SKID piping and process equipment for 25.000 Nm3/h Hydrogen Plant.

In total, the following items were installed:

  • 7 pcs of skids,
  • 160t of piping,
  • 8t of storage,
  • 11 apparatus, 
  • the order was completed including painting, insulation and packaging,
  • in total 35 000 hours were worked.

Manufactured in accordance with ASME and PED regulations (CAT 4.3, I and II).

Work on the skids took 6 months.

Are you looking for a similar project supplier? Contact us.